Farm Pond Construction

3 years ago | Jamie Dick

The design and construction of a new pond on a farm site in Thornhill, near Stirling - undertaken in May 2020.


Twinwall Leader Pipe

3 years ago | Jamie Dick

The installation of a new 300ml twin wall pipe adjacent to the A91, for Stirling Council in March 2020.


Field Flood

3 years ago | Jamie Dick

Partially renewing an existing drainage system on a farm based at Gorebridge, in 2018.


Water Under the Bridge

3 years ago | Jamie Dick

Installation of a 150mm twin wall leader drain under a viaduct of the main railway line between Edinburgh and Glasgow, in 2019.


Deep Leader Drain

3 years ago | Jamie Dick

The installation of a new 150ml coil pipe into a low-lying field. Thereafter a new drainage system was installed, near Clackmannan, Stirlingshire.


New Field Scheme

3 years ago | Jamie Dick

The design and installation of a completely new drainage system, on the Carse of Stirling, in 2018.


Equestrian Menage Construction

3 years ago | Jamie Dick

The design, installation and construction of a new manage on a homestead near Blackness, in 2016.


Construction Site Deep Drain

3 years ago | Jamie Dick

On the site of a newly formed respite home, installing a 150ml twin wall pipe at a depth of 3 metres as the main outlet for all drainage – taken in 2020.